Investment projects

Business Centre at Poklonnaya

    <<  1  2  3  4  >> 

Address: Estate 9, Pokolnnaya Street, Moscow

Total area: 100,000 sq. m

Project IRR (Internal Rate of Return): 43%



The KV Engineering Company joined the project in 2002. It came up with an architectural concept and a town-planning scheme. KV Engineering brought the American company, Cushman & Wakefield, which specializes in high-rise building, into the designing work. All the technical conditions for communications were obtained and 22,000 sq. m. of below-ground building work was completed. In 2004, the Mirozdaniе Group of Companies (KV Engineering) launched the current project.

A multi-functional business centre

The architectural and planning solutions for building the hotel and business complex (located at the address: estate 9, Pokolnnaya Street, Moscow), were carried out according to an order made by the Finance Centre of the Interbank Currency Exchange.

The construction area located next to Kutuzovsky Avenue and the 1812 Boulevard is bounded by 2 nd Poklonnaya Street in the north and the mainline railway to Kiev in the south.

The project proposes the creation of a single multi-functional complex, which includes office premises, apartments, a fitness centre, restaurants, cafés and various services.

Calculation of the main parameters for service and ancillary premises, and also the public areas was based on standards developed by the British Council for Offices and the international standards set by the BOMA (Building Owners and Managers Association), and adapted to conditions currently obtaining in the Moscow real-estate market.

The town-planning and architectural-planning solution and the provision of services and utilities:

The main building of the complex should be designed as a compact space, consisting of two structures of 27 and 23 storeys which are joined by a central staircase-elevator unit that has a greater number of floors than the office wings so as to create a more impressive silhouette. The height of the 27-storey structure to its parapet is 110m. The height of the central 30-storey unit to the top of its parapet is 123m., and to the top of the ornamental metal constructions in the central part of the building – 128m.

The main entrance to the complex is located on the 1812 Boulevard side, from where there is an approach to the central vestibule on the ground-floor level via a main staircase or up an automobile ramp with a pavement on either side. The lifts to the higher part of the complex start on the second floor. The route to the lift halls is controlled by an intelligent access system. The vestibule is designed as an atrium with four rows of windows, and containing elements of greenery and providing services and utilities. Over the main entrance there is an overhang in the form of a spacious glass construction supported by two columns.

In addition to the main entrance, there are two supplementary entrances on the east and the west sides leading to ancillary vestibules. The entrance on the east side is intended primarily for clients and staff, who have left their vehicles in the open car park, which is located on that side. The entrance on the west side is intended primarily for residents and visitors to the apartments located in the upper part of the complex. The western vestibule is adjacent to a separate lift that goes to the apartment area. On the southern side there is a loading bay with the appropriate facilities for serving the restaurants, cafés and shops. On this side there is also a ramp for driving down to the lower parking lot as well as access to the transformer substations.

Future development of the complex in the direction of Mosfilmovskaya Street envisages the creation of a pedestrian shopping bridge with parking places above the main Kiev railway line between the complex and the projected second Kutuzovsky Avenue; it also foresees the possible organization here of a transfer connection. Thus in accordance with the general plan for the development of Moscow, the building will be sited between two major highways - if the project to build a second highway alongside Kutuzovsky Avenue goes ahead. At present the General Moscow City-Planning Institute is preparing a feasibility study for the development of the adjacent area and for the organization of planned communications of this sort.

The lower five floors are intended for public use. Apart from the entrance facilities and the atrium, this includes restaurants and cafés, the business centre, the conference hall, the fitness centre with its winter garden, and various shops and services. The floors in the public area are connected by escalators, a central staircase-elevator unit, and staircases which do not reach the higher floors.

Offices are located between the 6th and the 22th floors. The 23 rd floor is given over to service areas and a small fitness centre for the apartments. The 24 th to the 29th floors are where the apartments (of different areas and configurations) are located. Part of the 24 th and 25th floors is occupied by a winter garden with two rows of windows and places set aside for rest and relaxation. The upper floor (the 30 th) is given over to engineering equipment. The office area is designed to be open planned. This makes it possible to split up or combine areas according to the requirements of future lessees.

All the floors are connected by a central staircase-elevator unit. This has the main passenger lifts consisting of six lifts covering the 2 nd to the 15th floors and four lifts covering the 16 th to the 22th floors, which also stop on all the public floors.

One of the lifts that go up to the 22nd floor is a fire lift, which can stop at all floors including those in the apartment areas. Apart from that, there is a separate lift in the apartment area, which also stops at the public floors and can also be used as a fire lift.

The four lower levels of the underground part of the complex have 364 parking spaces as well as various technical and ancillary areas. The upper level of the underground part contains the main technical areas of the building and the vehicle-wash. The areas for the movement and parking of motor vehicles are marked by metre-high wheel-shaped baffles set along the borders.

The neighbouring plot of land, which is currently used for open parking and is being equipped with various services and utilities, will be the site of an open parking lot with 111 parking spaces, making a total (together with the underground parking) of 475 spaces in all.

There are plans to lay a circular road (6m. in width) all around the building. The pavements and ramps that run from the side of the main entrance will be made with sandy-concrete paving stones. The stylobate part of the building is faced with granite slabs. It is planned to use under-heating for the external staircases, ramps and accompanying pavements, and for the facing of the stylobate part. There are plans for that part of the complex area, where there are no slip-roads or car parks to be planted with lawns.

In order to ensure that the complex has an optimum number of parking spaces, it is proposed to build on the adjacent area of land a four-storey building providing unheated parking, where on five levels (the four floors and the roof) there will be space for a further 480 vehicles.

  1. The effective height of a floor (i.e. the distance between the lowest point of the hanging ceiling and the highest point of the false floor) is a minimum of 2.80m.
  2. The number of parking spaces in the car park: 475.
  3. The carwash.
  4. The effective layout (i.e. the possibility of dividing a floor into rented units of approximately 500 m2 while retaining a high level of natural insulation and ensuring that each leased unit can be individually connected to the building’s engineering systems).
  5. Noise level in the premises: not more than 40 decibels.
  • The building is centrally heated, but the system is designed to be used independently.
  • The hot-water circulating system can be controlled independently (irrespective of the hot-water supply from the city) .
  • The multi-contour cold-water supply system.
  • Central air conditioning, central cold supply (which can be operated during the winter period) with the opportunity to connect to supplementary fan-coils.
  • Steam-humidification of the air (in places where this is essential).
  • A system for controlling access to all areas of the building, including the underground and ground-based parking lots with areas given an order of precedence which can be changed by means of the system’s software. A screening system integrated into the fire-protection system.
  • Digital CCTV with the facility for automatic picture analysis.
  • An intelligent system for notifying the occurrence of emergencies.
  • An automatic fire-alarm system and fire-extinguishing facilities throughout the building.
  • The opportunity for tenants to connect simultaneously with various telecommunications providers, including the Moscow City Telephone Network. Fibre optic communication lines to the connection input located on the leased premises.
  • The opportunity to use the building’s common automatic telephone system or install one’s own.
  • A controller system keeping a check on all the building’s engineering systems and monitoring the fire-protection system.
  • Centralized automated accounting of all tenants’ expenses available in real time.
  • Public catering enterprises of various profiles including those with the the complete technological cycle.
  • Shopping areas (with shops offering the following types of goods: food, women’s goods, office requirements, photographic + batteries, mobile communications).
  • Fitness club.
Print version